مقاله The study of drainage and water pumping of spillway and hydropower plant foundation in Sangtuda 2 project, Tajikistan با


برای دریافت اینجا کلیک کنید

مقاله The study of drainage and water pumping of spillway and hydropower plant foundation in Sangtuda 2 project, Tajikistan با word دارای 7 صفحه می باشد و دارای تنظیمات در microsoft word می باشد و آماده پرینت یا چاپ است

فایل ورد مقاله The study of drainage and water pumping of spillway and hydropower plant foundation in Sangtuda 2 project, Tajikistan با word کاملا فرمت بندی و تنظیم شده در استاندارد دانشگاه و مراکز دولتی می باشد.

این پروژه توسط مرکز مرکز پروژه های دانشجویی آماده و تنظیم شده است

توجه : در صورت  مشاهده  بهم ریختگی احتمالی در متون زیر ،دلیل ان کپی کردن این مطالب از داخل فایل ورد می باشد و در فایل اصلی مقاله The study of drainage and water pumping of spillway and hydropower plant foundation in Sangtuda 2 project, Tajikistan با word،به هیچ وجه بهم ریختگی وجود ندارد


بخشی از متن مقاله The study of drainage and water pumping of spillway and hydropower plant foundation in Sangtuda 2 project, Tajikistan با word :

سال انتشار: 1392
محل انتشار: اولین کنفرانس ملی مهندسی ژئوتکنیک
تعداد صفحات: 7
چکیده:

Seepage of dam foundation area and reservoirs are considerable problems that most of these structuresare involved with. Escape of water from reservoirs, the possibility to create high pressure (upliftpressure), underground water level control, increasing the volume of water pumping from project areaand consequently increasing administrative costs and reducing efficiency are the most importantproblems. Sangtuda 2 Dam and Power plant Project is one of the ninth serial dams that are constructedover the Vakhsh River, one of the Amudarya branches. This dam is under construction, due to its locationon the lime stone layers and due to the high karstification and Tectonics situation at run time encounteredwith lots of water leakage and overflow in spillway and power plant area. Water outflow increased up to8 cubic meters per second at the time being. The water rate increase administrative costs (due to highcosts of pumping water from the pit, sharp reduction in work efficiency an;). This article reviews thestatus of geology, hydrological, Tectonic and geotectonic in project area. Maximum water volumeestimation in the possible ranges is established numerically by software to achieve perfect solutions.Solving methods and reviews the results indicates the need to pump about 10 cubic meters per secondfrom the plant bed (level 450).


دانلود این فایل


برای دریافت اینجا کلیک کنید
نظرات 0 + ارسال نظر
امکان ثبت نظر جدید برای این مطلب وجود ندارد.